- Unit 01: Basic administration concepts: scheduling network,
UNIX System Services, factors involved in the design of a scheduling network.
- Lab 01: Given a set of user requirements for batch
scheduling, design a scheduling network.
- Unit 02: Basic administration concepts: relationship
between Tivoli Framework and Tivoli Workload Scheduler.
- Lab 02: Install a standalone Tivoli Framework and configure
for Workload Scheduler. Configure an existing Tivoli Framework for
Workload Scheduler.
- Unit 03: Basic administration concepts: Installation
prerequisites for Unix and Windows.
- Lab 03: Install a primary domain manager on
Unix. Install a primary domain manager on Windows (optional).
- Unit 04: Basic administration concepts: Using the twsinst and ismp
programs.
- Lab 04: Update or refresh a Workload Scheduler installation.
- Unit 05: Basic administration concepts: domains, domain
managers.
- Lab 05: Design, install and configure a domain in a
scheduling network.
- Unit 06: Basic administration concepts: key files and
directories of Workload Scheduler, key environment variables.
- Unit 07: Intermediate administration concepts: role of
Connector servers.
- Lab 06: Install and modify Connector servers.
- Unit 08: Intermediate administration concepts: start of day
processing (CP extend).
- Unit 09: Intermediate administration concepts: time zones.
- Lab 07: Enable time zones in Workload Scheduler. Given a
set of jobs on two separate workstations, predict when each will
launch, then observe the actual release of the jobs. Given a set of
user requests, implement jobs across two different time zones and
workstations.
- Unit 10: Intermediate administration concepts: job states,
job stream states, internal states.
- Lab 8: Given a set of jobs and job streams, force the
expression of various states in the JSC and observe the corresponding
internal states.
- Unit 11: Intermediate administration concepts: daemons and
programs used by Workload Scheduler.
- Lab 9: Diagram which programs and daemons are started or
executed during Jnextday, and which are used when a job is executed.
- Unit 12: Intermediate administration concepts: maintenance
of Workload Scheduler.
- Lab 10: Manually perform the maintenance procedures for
Workload Scheduler, then automate one of the steps.
- Unit 13: Intermediate administration concepts: global
options, local options, standard configuration script, and local
configuration scripts.
- Lab 11: Given a set of user requests to configure the
behavior of Workload Scheduler, implement the requests using global
options, local options, standard configuration script, or local
configuration scripts where appropriate.
- Unit 14: Advanced administration concepts: primary domain
manager failover.
- Lab 12: Perform procedures to fail over a primary domain
manager to a backup domain manager, perform procedures to make the
failover permament, perform procedures to fail back.
- Unit 15: Advanced administration concepts: security
configuration.
- Lab 13: Given a set of user requirements, implement a
security file then test the implementation through the JSC.
- Unit 16: Advanced administration concepts: auditing.
- Lab 14: Navigate to and inspect the audit files.
- Unit 17: Advanced administration concepts: troubleshooting
resources.
- Lab 15: Given a broken scheduling network, debug and
correct the source of the problem.
- Unit 18: Advanced administration concepts: support and
information resources.
- Lab 16 (Optional, requires Internet access): File a PMR
online, visit online resources.
|